Why Colchester Roofs Dam Up: Deep Cold and a Long Snow Season
There is no mid-winter reset in Colchester. The snow that falls in November is still part of the pack in March, compressed by everything that landed on top of it, and the eave underneath has been below freezing the whole time.

The ice that comes off a roof in Colchester in February is rarely one event's worth. It is a laminated record of the whole season, which is why it is thick, dense and firmly bonded to the shingle.
Ice-barrier practice in Chittenden County
Ice barrier at the eaves is a standard requirement on new work across Vermont. The question on any particular Colchester house is when it was last roofed, because that decides whether it is there at all.
How a Colchester Steam Call Runs, Start to Finish
Crews walk the eaves, valleys and gutter line first and photograph every dam and every point where water is tracking inside, before touching anything. You get shown what they found and quoted the crew-hour rate before work starts.
Then the ice comes off with low-pressure steam, starting wherever water is actively backing up so drainage opens early. Frozen gutters and downspouts are cleared in the same visit, because a cleared eave above a solid block of ice in the gutter dams again on the next cold night.
Why salt and ice melt make it worse
Calcium chloride opens a narrow channel and leaves the dam standing. The channel refreezes, the dam does not go anywhere, and in the meantime the runoff corrodes gutter seams, fasteners, flashing and anything growing underneath.
It is a stopgap at best. On a roof in Colchester with an active leak it buys hours, not days, and it adds a corrosion problem to the water problem.
If water already got inside
Taking the ice off stops new water. It does nothing about what is already in the insulation, the ceiling and the walls of a Colchester home.
The same company handles the rest: water mitigation and dryout, mold remediation where the water has led to growth, the interior repair, and the roof where the dam damaged it, all documented on one insurance claim.
Working at night and during an active storm
Freeze events do not keep office hours, and the worst leaks tend to announce themselves in the evening when the day's melt refreezes. Crews run lit, and a roof that is actively collecting snow is worked anyway, because waiting for better weather means the dam is bigger when somebody finally gets to it.
What does stop a crew is wind and lightning. Both are judgment calls made on site in Colchester, and a postponed start gets explained rather than dressed up.
| Local ice-barrier practice | Eave membrane required on new work |
|---|---|
| Documentation | Dated before and after photos, written scope in Xactimate line items |
| Dispatch window | Same day to 24 hours |
| Pricing model | Billed by the crew hour, rate quoted before dispatch |
| Service | Ice dam removal in Colchester, VT |
| Coverage area | Colchester and Chittenden County |
| Typical scope | Steam, 6-14 crew hours typical |
Where We Dispatch Around Colchester
Crews working Colchester cover the adjoining communities on the same route — Essex Junction, South Hero, Westford, Shelburne and Jericho — so a storm week usually means one truck handling several addresses in Chittenden County rather than separate trips.
Nearest hub towns with their own crew pages: Winooski, Burlington, Essex, South Burlington, Milton, Williston.
Colchester sits inside the regular Vermont service area, so a crew is usually scheduled the same day or the following morning.
Active leak at an address in Colchester? (888) 561-9664 reaches dispatch directly. Interior water moves a job to the front of the day.














