Sun on Cold Snow: The Laramie Pattern
At Laramie's elevation the air can stay below freezing all day while direct sun still melts the top of the snowpack. That meltwater runs down under the pack, reaches a shaded eave, and refreezes — on a day the thermometer never rose above freezing.

Aspect decides which eaves suffer. A sunny plane sheds water across a roof in Laramie to a shaded eave that has not been above freezing for weeks, and that is where the ice builds into a wall.
Ice-barrier practice in Albany County
High-country Wyoming codes typically call for extended ice barrier and, on metal roofing, snow guards above any door, walkway or parking area. Both exist because of what comes off these roofs.
How a Laramie Steam Call Runs, Start to Finish
The first pass is assessment: eaves, valleys, gutter line and any interior staining, all photographed with timestamps. You see what the crew sees, and the rate and likely hours are agreed before work begins.
Steam then takes the dam off in sections, prioritizing wherever water is actively backing up behind it. The gutter trough and downspout are cleared through to daylight on the same visit, because a clear eave over a frozen gutter is a temporary fix.
Why a drainage channel is not removal
Cutting a few channels through a dam so water can get past is quick and it is sometimes sold as ice dam removal. It drains the roof for as long as the channels stay open, which in a Laramie cold snap can be a single night before they close again.
Removing the dam means taking the ice off down to the shingle along the whole affected run, so the eave can drain the way it was built to. It takes longer and it is the only version that holds.
What gets photographed, and why it matters later
Before the lance comes out, the crew shoots the dam from the ground and from the roof, the icicle line, any staining visible inside, and the specific courses where water is tracking under the shingles. Timestamps are on every frame.
That record is the whole case if a claim follows. An adjuster arriving in March sees a dry roof and a stained ceiling; the photographs are what connect the two, and they are what a maintenance-exclusion denial runs into.
What the crew does on arrival
Before anything is touched, the crew walks the eaves, valleys and gutter line and photographs every dam and every point where water is tracking inside. You get shown what they found. Then the dam comes off in sections, starting wherever water is actively backing up, so drainage opens early rather than at the end.
Downspouts and gutter troughs get cleared in the same visit where they are frozen, because a dam removed above a solid block of ice in the gutter just reforms in the next cold night.
| Documentation | Dated before and after photos, written scope in Xactimate line items |
|---|---|
| Service | Ice dam removal in Laramie, WY |
| Removal method | Low-pressure steam only. No chipping, salt or pressure washing. |
| Pricing model | Billed by the crew hour, rate quoted before dispatch |
| Local ice-barrier practice | Extended membrane plus snow retention |
| Coverage area | Laramie and Albany County |
| Typical scope | Steam, 8-16 crew hours typical |
Neighborhoods and Towns We Reach From Laramie
Crews working Laramie cover the adjoining communities on the same route — Buford — so a storm week usually means one truck handling several addresses in Albany County rather than separate trips.
Nearest hub towns with their own crew pages: Cheyenne, Douglas, Casper, Riverton, Rock Springs, Lander.
Coverage runs across Laramie and the nearby towns all winter, and capacity is surged into whichever Wyoming market the storm actually hits.
Active leak at an address in Laramie? (888) 561-9664 reaches dispatch directly. Interior water moves a job to the front of the day.















