Small Snow, Repeated Cycles: Snowshoe Ice Dams
The snow totals here are unremarkable, which is exactly why Snowshoe roofs get caught out. An ice dam needs meltwater and a cold eave, not a record storm.

And the cycling is relentless rather than dramatic. Fifteen or twenty crossings of freezing in a season each add a layer, and the houses with the thinnest attic insulation in Pocahontas County all find out in the same week.
Ice-barrier practice in Pocahontas County
Ice-barrier membrane at the eaves is required on new work under the residential code West Virginia follows, but on a roof built before that it is frequently absent — and this is the region where it is most often skipped.
The Snowshoe Dispatch Process, Step by Step
Nothing gets touched until the roof has been walked and photographed. The crew finds every dam, locates where water is getting in, shows you, and gives you the crew-hour rate and a time estimate before the equipment comes off the truck.
Removal then works from the worst point outward, so water starts draining early rather than at the end. Gutters and downspouts frozen solid get steamed through in the same visit — leaving them means the eave dams again within days.
What steam actually does
A steam unit delivers water at roughly 290°F at a pressure low enough to rest your hand in the plume. It cuts a channel straight through the ice and lifts the dam off in sections, right down to the shingle. The heat does the work, not force, so granules, seal strips and flashing come through untouched.
That is the whole difference between steam and the hot pressure washers often sold as steam. A pressure washer cuts ice fast because of its pressure — and that same pressure strips the granules off asphalt shingles and drives water up under the courses. One method removes ice. The other removes ice and roof.
How long a removal actually takes
A single-story eave with a thin dam and clear gutters is often an hour or two. A two-story Snowshoe house with ice standing a foot deep across the front, frozen downspouts and a valley packed solid is most of a day for a two-man crew. The honest answer on the phone is a range and the reason for it, not a number designed to win the booking.
The estimate is revised out loud if the roof turns out worse than it looked from the ground, before the extra hours are worked rather than after they appear on the invoice.
What happens after the ice is off
Once the eave is clear and water is draining, the crew walks the interior with you where there is visible damage and says plainly whether it needs drying. Wet insulation and a damp ceiling cavity do not resolve themselves in a cold Snowshoe February.
If it does, that is a separate scope and it gets written separately — nobody is upsold a dryout on the strength of one damp patch.
| Service | Ice dam removal in Snowshoe, WV |
|---|---|
| Pricing model | Billed by the crew hour, rate quoted before dispatch |
| Dispatch window | Same day to 24 hours |
| Removal method | Low-pressure steam only. No chipping, salt or pressure washing. |
| Local ice-barrier practice | Eave membrane on new work, often absent |
| Documentation | Dated before and after photos, written scope in Xactimate line items |
| Primary climate stressor | Repeated thaw-freeze cycling |
Neighborhoods and Towns We Reach From Snowshoe
Crews working Snowshoe cover the adjoining communities on the same route — Slatyfork, Bergoo, Monterville, Valley Head and Marlinton — so a storm week usually means one truck handling several addresses in Pocahontas County rather than separate trips.
Nearest hub towns with their own crew pages: Elkins, Lewisburg, Davis (Canaan Valley), Clarksburg, Beckley, Fairmont.
Crews cover Snowshoe and the surrounding Pocahontas County towns through the whole season, and during a freeze event they run from first light until dark.
Water coming in right now in Snowshoe? Call (888) 561-9664. Active interior leaks go to the front of the schedule.















