Why Murray Roofs Dam Up: Altitude Sun on a Deep Pack
Altitude makes the sun stronger and the air colder at the same time. A roof in Murray can be producing meltwater on its south face at midday while the thermometer reads well below freezing.

Volume is the other factor. A Salt Lake County roof carrying several feet of pack has an enormous reservoir above an overhang that never sees direct sun, and the supply does not run out until spring.
Ice-barrier practice in Salt Lake County
Design snow loads up here are among the highest in the country, and the membrane and retention details that come with them are not paperwork. On an older Murray cabin neither is likely to be present.
How We Work a Murray Ice Dam
Nothing gets touched until the roof has been walked and photographed. The crew finds every dam, locates where water is getting in, shows you, and gives you the crew-hour rate and a time estimate before the equipment comes off the truck.
Removal then works from the worst point outward, so water starts draining early rather than at the end. Gutters and downspouts frozen solid get steamed through in the same visit — leaving them means the eave dams again within days.
Why the gutter has to be cleared in the same visit
A dam sitting above a gutter packed solid with ice is only half the problem. Clear the eave and leave the trough frozen, and the next day's meltwater has nowhere to run — it backs up onto the roof and the dam rebuilds from the bottom.
Crews steam the trough and the downspout through to daylight on the same visit. It adds time, which is why the hour estimate given on the phone accounts for it, and it is the difference between a fix and a repeat visit in Murray the following week.
Working at night and during an active storm
Freeze events do not keep office hours, and the worst leaks tend to announce themselves in the evening when the day's melt refreezes. Crews run lit, and a roof that is actively collecting snow is worked anyway, because waiting for better weather means the dam is bigger when somebody finally gets to it.
What does stop a crew is wind and lightning. Both are judgment calls made on site in Murray, and a postponed start gets explained rather than dressed up.
What steam actually does
A steam unit delivers water at roughly 290°F at a pressure low enough to rest your hand in the plume. It cuts a channel straight through the ice and lifts the dam off in sections, right down to the shingle. The heat does the work, not force, so granules, seal strips and flashing come through untouched.
That is the whole difference between steam and the hot pressure washers often sold as steam. A pressure washer cuts ice fast because of its pressure — and that same pressure strips the granules off asphalt shingles and drives water up under the courses. One method removes ice. The other removes ice and roof.
| Primary climate stressor | Solar melt on deep pack, shaded eaves |
|---|---|
| Service | Ice dam removal in Murray, UT |
| Documentation | Dated before and after photos, written scope in Xactimate line items |
| Local ice-barrier practice | Extended membrane plus snow retention |
| Pricing model | Billed by the crew hour, rate quoted before dispatch |
| Dispatch window | 24 to 48 hours in mountain terrain |
| Coverage area | Murray and Salt Lake County |
Murray Coverage and the Adjoining Communities
Crews working Murray cover the adjoining communities on the same route — Magna, North Salt Lake and Bingham Canyon — so a storm week usually means one truck handling several addresses in Salt Lake County rather than separate trips.
Nearest hub towns with their own crew pages: Millcreek, Taylorsville, Midvale, West Jordan, Cottonwood Heights, Sandy.
Scheduling for Murray tightens up during a freeze event, which is exactly when the phone beats the form. Water coming in means a call, not an email.
Water through a ceiling in Murray is a same-day call, not a next-week one. (888) 561-9664 goes straight to dispatch.















