Easton Ice Dams: Wet Snow and a Thermometer That Will Not Settle
A nor'easter can load a roof in Easton with heavy, wet snow overnight. Coastal air then swings the temperature either side of freezing for days, which is the exact condition that builds ice fastest.

The building stock compounds it. A great many Easton houses were built long before attic air sealing was a consideration, and the retrofits that followed often insulated the floor while leaving the bypasses wide open.
Ice-barrier practice in Northampton County
Coastal Pennsylvania jurisdictions generally require the membrane to extend past the interior wall line. On a house in Easton with a deep overhang that is further up the roof than a single course.
How We Work an Easton Ice Dam
Crews walk the eaves, valleys and gutter line first and photograph every dam and every point where water is tracking inside, before touching anything. You get shown what they found and quoted the crew-hour rate before work starts.
Then the ice comes off with low-pressure steam, starting wherever water is actively backing up so drainage opens early. Frozen gutters and downspouts are cleared in the same visit, because a cleared eave above a solid block of ice in the gutter dams again on the next cold night.
What the crew does on arrival
Before anything is touched, the crew walks the eaves, valleys and gutter line and photographs every dam and every point where water is tracking inside. You get shown what they found. Then the dam comes off in sections, starting wherever water is actively backing up, so drainage opens early rather than at the end.
Downspouts and gutter troughs get cleared in the same visit where they are frozen, because a dam removed above a solid block of ice in the gutter just reforms in the next cold night.
Why the gutter has to be cleared in the same visit
A dam sitting above a gutter packed solid with ice is only half the problem. Clear the eave and leave the trough frozen, and the next day's meltwater has nowhere to run — it backs up onto the roof and the dam rebuilds from the bottom.
Crews steam the trough and the downspout through to daylight on the same visit. It adds time, which is why the hour estimate given on the phone accounts for it, and it is the difference between a fix and a repeat visit in Easton the following week.
Why salt and ice melt make it worse
Calcium chloride opens a narrow channel and leaves the dam standing. The channel refreezes, the dam does not go anywhere, and in the meantime the runoff corrodes gutter seams, fasteners, flashing and anything growing underneath.
It is a stopgap at best. On a roof in Easton with an active leak it buys hours, not days, and it adds a corrosion problem to the water problem.
| Service | Ice dam removal in Easton, PA |
|---|---|
| Removal method | Low-pressure steam only. No chipping, salt or pressure washing. |
| Coverage area | Easton and Northampton County |
| Local ice-barrier practice | Eave membrane standard on re-roofs |
| Documentation | Dated before and after photos, written scope in Xactimate line items |
| Primary climate stressor | Nor'easters, rapid thaw-freeze swing |
| Typical scope | Steam, 4-10 crew hours typical |
Easton Coverage and the Adjoining Communities
Crews working Easton cover the adjoining communities on the same route — Stockertown, Tatamy, Nazareth, Martins Creek and Wind Gap — so a storm week usually means one truck handling several addresses in Northampton County rather than separate trips.
Nearest hub towns with their own crew pages: Bethlehem, Allentown, Pocono Pines, Hazleton, Pottstown, Norristown.
When a storm hits Northampton County, crews are dispatched by severity rather than by call order — water already inside the house goes first.
Water through a ceiling in Easton is a same-day call, not a next-week one. (888) 561-9664 goes straight to dispatch.















