Beverly Ice Dams: Wet Snow and a Thermometer That Will Not Settle
A nor'easter can load a roof in Beverly with heavy, wet snow overnight. Coastal air then swings the temperature either side of freezing for days, which is the exact condition that builds ice fastest.

Retrofits often made it worse rather than better. Insulation laid on an attic floor without sealing the bypasses underneath it keeps the living space warm and sends the same warm air straight to the roof deck.
Ice-barrier practice in Essex County
Most Essex County towns require self-adhering ice barrier at the eaves on a re-roof permit. In a historic district there may be additional review on materials, which is worth checking before work is scheduled.
The Beverly Dispatch Process, Step by Step
Nothing gets touched until the roof has been walked and photographed. The crew finds every dam, locates where water is getting in, shows you, and gives you the crew-hour rate and a time estimate before the equipment comes off the truck.
Removal then works from the worst point outward, so water starts draining early rather than at the end. Gutters and downspouts frozen solid get steamed through in the same visit — leaving them means the eave dams again within days.
Why salt and ice melt make it worse
Calcium chloride opens a narrow channel and leaves the dam standing. The channel refreezes, the dam does not go anywhere, and in the meantime the runoff corrodes gutter seams, fasteners, flashing and anything growing underneath.
It is a stopgap at best. On a roof in Beverly with an active leak it buys hours, not days, and it adds a corrosion problem to the water problem.
Why the dam formed in the first place
Ice dams are a heat problem wearing a weather costume. Warm air escaping into the attic melts snow on the upper roof; that meltwater runs to the eave, which hangs past the heated envelope and stays below freezing; it refreezes there, and the ridge of ice grows a layer every cycle. Removal is the emergency fix. Before the crew leaves you will know which part of your attic is feeding it.
What the dam has already done to the gutter and fascia
Ice expands as it forms, and a trough packed solid pushes the gutter away from the fascia a little more every cycle. By the time the dam is thick enough to leak, the hangers are often pulled, the back of the trough has lifted, and the fascia board behind it has been wet for weeks.
None of that is visible until the ice is off. It gets photographed when it appears, because a bent gutter found in February is a great deal easier to argue about with a carrier than one discovered in May.
| Typical scope | Steam, 4-10 crew hours typical |
|---|---|
| Coverage area | Beverly and Essex County |
| Primary climate stressor | Nor'easters, rapid thaw-freeze swing |
| Dispatch window | Same day to 24 hours |
| Local ice-barrier practice | Eave membrane standard on re-roofs |
| Pricing model | Billed by the crew hour, rate quoted before dispatch |
| Removal method | Low-pressure steam only. No chipping, salt or pressure washing. |
Where We Dispatch Around Beverly
Crews working Beverly cover the adjoining communities on the same route — Prides Crossing, Wenham, Hamilton, South Hamilton and Marblehead — so a storm week usually means one truck handling several addresses in Essex County rather than separate trips.
Nearest hub towns with their own crew pages: Salem, Danvers, Peabody, Lynn, Saugus, Gloucester.
Beverly sits inside the regular Massachusetts service area, so a crew is usually scheduled the same day or the following morning.
Water coming in right now in Beverly? Call (888) 561-9664. Active interior leaks go to the front of the schedule.