New Britain Ice Dams: Wet Snow and a Thermometer That Will Not Settle
A nor'easter can load a roof in New Britain with heavy, wet snow overnight. Coastal air then swings the temperature either side of freezing for days, which is the exact condition that builds ice fastest.

Retrofits often made it worse rather than better. Insulation laid on an attic floor without sealing the bypasses underneath it keeps the living space warm and sends the same warm air straight to the roof deck.
Ice-barrier practice in Hartford County
In most coastal Connecticut towns the eave membrane requirement extends past the interior wall line rather than stopping at the first course. On a roof in New Britain with a deep overhang, that is further up than it sounds.
How a New Britain Steam Call Runs, Start to Finish
Nothing gets touched until the roof has been walked and photographed. The crew finds every dam, locates where water is getting in, shows you, and gives you the crew-hour rate and a time estimate before the equipment comes off the truck.
Removal then works from the worst point outward, so water starts draining early rather than at the end. Gutters and downspouts frozen solid get steamed through in the same visit — leaving them means the eave dams again within days.
Why a drainage channel is not removal
Cutting a few channels through a dam so water can get past is quick and it is sometimes sold as ice dam removal. It drains the roof for as long as the channels stay open, which in a New Britain cold snap can be a single night before they close again.
Removing the dam means taking the ice off down to the shingle along the whole affected run, so the eave can drain the way it was built to. It takes longer and it is the only version that holds.
What gets photographed, and why it matters later
Before the lance comes out, the crew shoots the dam from the ground and from the roof, the icicle line, any staining visible inside, and the specific courses where water is tracking under the shingles. Timestamps are on every frame.
That record is the whole case if a claim follows. An adjuster arriving in March sees a dry roof and a stained ceiling; the photographs are what connect the two, and they are what a maintenance-exclusion denial runs into.
Working at night and during an active storm
Freeze events do not keep office hours, and the worst leaks tend to announce themselves in the evening when the day's melt refreezes. Crews run lit, and a roof that is actively collecting snow is worked anyway, because waiting for better weather means the dam is bigger when somebody finally gets to it.
What does stop a crew is wind and lightning. Both are judgment calls made on site in New Britain, and a postponed start gets explained rather than dressed up.
| Removal method | Low-pressure steam only. No chipping, salt or pressure washing. |
|---|---|
| Primary climate stressor | Nor'easters, rapid thaw-freeze swing |
| Coverage area | New Britain and Hartford County |
| Typical scope | Steam, 4-10 crew hours typical |
| Dispatch window | Same day to 24 hours |
| Pricing model | Billed by the crew hour, rate quoted before dispatch |
| Documentation | Dated before and after photos, written scope in Xactimate line items |
Where We Dispatch Around New Britain
Crews working New Britain cover the adjoining communities on the same route — Berlin, Plainville, East Berlin, Wethersfield and Rocky Hill — so a storm week usually means one truck handling several addresses in Hartford County rather than separate trips.
Nearest hub towns with their own crew pages: Newington, Farmington, Southington, West Hartford, Bristol, Hartford.
Coverage runs across New Britain and the nearby towns all winter, and capacity is surged into whichever Connecticut market the storm actually hits.
Active leak at an address in New Britain? (888) 561-9664 reaches dispatch directly. Interior water moves a job to the front of the day.














